660”TUBING - 1371 Annonces
Friday 30 March 2018
Prix : USD310000/EA
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD310000/EA
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 315000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 315000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 315000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 305000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD 300000 per piece
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Friday 30 March 2018
Prix : USD310000/EA
DRILL PIPE PRODUCTION LINE: The production line for the processing and production of oil drilling pipe, is mainly divided into three steps, by using the upsetting machine, Intermediate frequency quenching and tempering machines, pipe threading lathes and some other machines. Highlights: 1...
Anyang Xinheng Machine Tool Co. Ltd.
- ayxinheng
- 455000 - Anyang
- +8613323626105
Wednesday 28 March 2018
Quantité : 300 sets/m - Prix : RMB2000-RMB1000000
- QC11K-CNC Hydraulic Guillotine Shearing Machine-DELEM DAC360 System - 1. The design of the machine conform to EU international standards. The fuselage eliminates internal stress by annealing and vibration, ensuring higher precision and strength.We use SOLID WORKS 3D programming...
Manshan Gilde CNC Machine Tool Co.,Ltd
- 243100 - Ma'anshan City
- 0555 2222129
Wednesday 28 March 2018
Quantité : 300 sets/m - Prix : RMB2000-RMB1000000
1. The design of the guillotine shear and cutter machine conforms to EU international standards. 2. The fuselage eliminates internal stress by annealing and vibration, ensuring high strength and precision. 3. Using SOLID WORKS 3D programming to design all these products and made with...
Manshan Gilde CNC Machine Tool Co.,Ltd
- 243100 - Ma'anshan City
- 0555 2222129
Tuesday 06 March 2018
Oil casing is used to support the oil, gas shaft wall of the pipe to ensure that the drilling process and after the completion of the normal operation of the entire well. Each well according to the different drilling depth and geological conditions, to use several layers of casing...
XI'AN SCOTON OILFIELD EQUIPMENT CO., LTD
- 710061 - Xian
- 029 62827812
Tuesday 13 February 2018
Quantité : 220 - Prix : 3,00 €
Lots de pantalons enfant CHICCO Quantité pour 1 lot : 220 pièces 3.00EUR H.T./Pièce 660.00EUR h.t. pour 1 lot de 220 pièces Conditions de paiement : nous proposons des facilités de Paiement pour les ouvertures de Boutiques. Sans RDV du lundi au vendredi de 10h30 à 17h30 samedi de 10h30 a 17h. Showroom : 4 avenue Danville, 94600 Choisy-le-Roi Parking Surveillé. Contactez Nicolas au 06...
Firoza Distribution SARL
- 94600 - Choisy-Le-Roi
- 06 68 89 19 45








